All things aside, we believe our work will speak for itself. Featured below, are a few of our recent projects, but we invite you to ask us about case studies that are more relevant to your specific requirements.
Scope:
This was an environmental compliance project to meet the air quality emission regulations, which prohibit the continuous flaring of Hydrogen sulfide (H2S). The Low-Pressure Sour Gas Project scope provided for new equipment installation to reduce H2S concentration in the existing gas streams.
Our Role:
NAES was appointed as the SMEIP construction contractor
Scope:
Mechanical and Piping on the Crude Flex EPCM Project in Saldanha.The Crude Flex II Project entails transferring crude oil from existing OTMS tanks to the Saldanha Milnerton Pipeline (SMP), which connects the SFF terminal to Astron’s Milnerton Refinery.
This is achieved by constructing a new Crude flex pump station, a 16” above and below ground pipeline running approximately 1.3km, a Crude flex transfer station on the SFF line, installing a new Nitrogen system and making new 20” connections to the existing storage tanks.
The purpose of the Project was to give flexibility to the ASTRON refinery, enabling Crude oil to be drawn from either the SFF facility or the OTMS facility.
Our Role:
NAES was appointed as the SMEIP construction contractor
Scope: Full mechanical and piping execution and subcontractor management for the removal and replacement of the top dome and associated piping headers.
Scope: Full mechanical and piping execution and subcontractor management for the auto-thermal reformer (ATR) shutdown, during 2016, 2017 and 2018.
Scope: Full welding execution and minor mechanical works for the regeneration unit shutdown.
Scope: Full provision of welding and mechanical services for the execution of maintenance, shutdowns and small improvement projects.
Scope: Full structural, mechanical and piping (SMP) works for the shutdown of the regeneration unit.
Scope: Full structural, mechanical and piping (SMP) works for the shutdown of the regeneration unit.
Scope: Full welding execution and minor mechanical works for the regeneration shutdowns required from 2014 to 2020.
Scope: Replacement of header at Sasol’s Steam Station in Sasolburg.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |